!-- ==================== [[[ HEADER AREA ]]] ==================== -->

Moment-stop improvement example

 

Moment-stop improvement example

Resin case supply process

Cost reducing effect

Achieved a reduction in labor cost of 330,000 yen/year.

Device description

This is a device that supplies resin cases for PC peripherals from a stocker to a conveyor.

Device description

Problems that have occurred so far

The impact that occurred when the horizontal axis stopped on the conveyor could cause the case to fall.
In addition, there were other issues where cases thrown in the direction of travel would overlap cases in front of them, or the distance between them and other cases would become narrower. This was causing the moment-stop.
The moment-stop was about 6 minutes, and it occurred about 6 times a day.

Problems that have occurred so far

Improvements brought by electrification

When moving horizontally, the deceleration when stopping can be set numerically, making it possible to stop smoothly without impact.
This eliminates problems such as cases falling and cases becoming too close together, and moment-stops no longer occur.

Device description

Cost reduction effect assuming the number of workers is 1

Conditions
Labor cost
2,300 yen/hour
Number of operation days per year
240 days
Effect

When air cylinders were in use, there were an average of six moment-stops per day, and it took six minutes each time to recover from them.

By using ELECYLINDER, the number of moment-stops decreased from 6 times/day to 0 times/day. The labor costs allocated to recover from these moment-stops

were reduced by 331,200 yen/year.

Breakdown

Time consumed by moment stops

Air cylinder: 6 minutes (moment-stop duration) x 6 times (moment-stop frequency) = 36 minutes/day
Electric cylinder: 0 minute

Labor costs incurred due to moment-stops

Air cylinder: 36 minutes x 2,300 yen/hour = 1,380 yen/day
1,380 yen/day x 240 days = 331,200 yen/year