No.1 Swing Mechanism
Component axis
- EC-RR6M-115-3-ACR-B-NJ-QR-WA
Operation Flow
- 1) Supply the cardboard
- 2) Fold the flaps using the electric cylinder
- 3) Discharge the cardboard to the next process
Specification Requirements
- Device
- Mass of the flap folding section: 2kg
- Load for flap folding: 4.9N
- Cycle time: 6 seconds
- Elecylinder
- Stroke required: 100mm
- One-way travel time: 0.8 seconds
- Operating Conditions
- Average operating time per day: 9 hours
- Number of operating days per year: 240 days
- Required lifespan: 10 years or more
Device Overview